Skip Navigation LinksHome >> The Projects
 
7.jpg
Description: Tank Prior to Rehabilitation
123

Setian Lane Tank Rehabilitation and Booster Pump Station

Client: Kent County Water Authority




Setian Lane Tank Rehabilitation and Booster Pump Station Design

 

Location: West Warwick, Rhode Island

 

Description:


• Complete rehabilitation of 3 MG water storage tank including coatings and structural components.
• Abatement of lead from existing exterior coating system
• Abated lead impacted soils from tank site
• Design and construction oversight of 2 MGD booster pump station to transfer water from low to high service pressure gradients
• Design of new emergency generator
• Design of 1000 feet of 12-inch transmission main
• Coordinated regulatory permitting and approval processes throughout all phases of the project